PS 343M

1 Peck Slip, NY
E.W. Howell
Grace Preprufe, Site Work
This is a new Elementary School located in lower Manhattan, NY. The original site consisted of an existing 4 story masonry building of the US Post office on the ground floor and other offices on the upper floors. The entire interior was gutted and two more floors were added to build the new school. EAI was hired by E.W. Howell to install 20,000 SF of Grace Preprufe Foundation Waterproofing system, site work, sidewalks, new water main connections, and monitoring well abandonment.